{"id":7144,"date":"2026-08-06T06:00:00","date_gmt":"2026-08-06T11:00:00","guid":{"rendered":"https:\/\/okdiario.com\/techy\/en\/?p=7144"},"modified":"2026-08-05T08:40:04","modified_gmt":"2026-08-05T13:40:04","slug":"goodbye-to-early-shutdown-the-uk-extended-its-last-nuclear-plant-by-20-years-while-spain-stalls","status":"publish","type":"post","link":"https:\/\/okdiario.com\/techy\/en\/goodbye-to-early-shutdown-the-uk-extended-its-last-nuclear-plant-by-20-years-while-spain-stalls\/7144\/","title":{"rendered":"Goodbye to early shutdown: the UK extended its last nuclear plant by 20 years while Spain stalls"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Britain has chosen to keep its newest operating nuclear plant running two decades longer, giving Sizewell B a path to generate electricity until 2055. Official EDF figures put the station at 1,198 megawatts, or about 1.2 gigawatts, and the plant currently supplies roughly 3% of the country\u2019s electricity needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is not a vote for nuclear power over renewables. It is closer to an insurance policy for a grid trying to reach at least 95% low-carbon generation by 2030 while building wind farms, solar projects, <a href=\"https:\/\/okdiario.com\/techy\/en\/portugal-built-a-giant-water-battery-inside-its-mountains-and-three-dams-now-store-clean-power-when-the-grid-needs-it-most\/4838\/\">storage<\/a>, and power lines at the same time.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A 20-year lifeline<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sizewell B began generating in 1995 and had been expected to close in 2035. Under the heads of terms signed by the government and EDF, the energy group plans to fund a refurbishment worth about $1.07 billion using the European Central Bank\u2019s reference exchange rate for July 8, 2026.<\/p>\n\n\n\n<div class=\"gb-element-a00da4e5\">\n<div><div class=\"gb-looper-46613eed\">\n<div class=\"gb-loop-item gb-loop-item-a8390598 post-6899 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-24a51617\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/britains-sizewell-b-nuclear-plant-has-won-a-20-year-life-extension-the-power-gap-it-must-close\/6899\/\">Britain&#8217;s Sizewell B nuclear plant has won a 20-year life extension: the power gap it must close<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The upgrades will be spread across planned outages over the next 15 years, reducing the need for one long shutdown. EDF says the extension could add about 180 terawatt-hours of <a href=\"https:\/\/www.edfenergy.com\/media-centre\/milestone-moment-sizewell-b-life-extension-agreement\" target=\"_blank\" rel=\"noopener\">electricity<\/a> and retain roughly 900 skilled jobs in Suffolk, while Ed Miliband, who was Energy Secretary when the deal was announced, called nuclear power \u201cvital for our energy security.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How the price guarantee works<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The proposed deal uses a 20-year <a href=\"https:\/\/www.gov.uk\/government\/collections\/electricity-market-reform-contracts-for-difference\" target=\"_blank\" rel=\"noopener\">Contract for Difference<\/a> beginning in 2035. Its strike price is roughly $94 per megawatt-hour in 2025 prices, while Centrica will support the investment through its 20% ownership stake in the station.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contract sets a reference price for Sizewell B\u2019s electricity. When the wholesale market price falls below that level, the Low Carbon Contracts Company pays the generator the difference, but when the market rises above it, the generator pays the excess back.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1013\" src=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1.jpg\" alt=\"The Sizewell B nuclear power station operating on the coast, representing low-carbon energy infrastructure in the UK.\" class=\"wp-image-7146\" title=\"\" srcset=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1.jpg 1800w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1-300x169.jpg 300w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1-768x432.jpg 768w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1-1536x864.jpg 1536w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-extends-sizewell-b-nuclear-plant-spain-stalls-1-150x84.jpg 150w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" \/><figcaption class=\"wp-element-caption\">The UK extends the operational lifespan of its last nuclear plant by 20 years to secure a steady low-carbon energy transition.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">There is an important catch. The long-form contract has not yet been completed, and the life extension still requires regulatory approvals, so this is a major milestone rather than the final legal word.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Britain\u2019s nuclear handoff<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Timing explains why Britain is extending an older plant while also building new reactors. Hartlepool and Heysham 1 are currently expected to generate until March 2028, while Heysham 2 and Torness are forecast to continue until 2030.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">EDF is organizing <a href=\"https:\/\/okdiario.com\/techy\/en\/the-worlds-largest-crane-lifts-a-500-ton-nuclear-reactor-into-place-and-hinkley-point-c-gets-harder-to-ignore\/5198\/\">Hinkley Point C<\/a> around its first reactor starting in 2030. Sizewell C and the first Rolls-Royce small modular reactors at Wylfa are expected to add new capacity during the 2030s, but that schedule leaves little room for another major construction delay.<\/p>\n\n\n\n<div class=\"gb-element-e62b4196\">\n<div><div class=\"gb-looper-b81d49fc\">\n<div class=\"gb-loop-item gb-loop-item-d903e0d9 post-6811 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-641b281b\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/india-locked-in-australian-uranium-to-chase-100-gw-of-nuclear-power-by-2047-modis-biggest-energy-bet\/6811\/\">India locked in Australian uranium to chase 100 GW of nuclear power by 2047: Modi&#8217;s biggest energy bet<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Sizewell B therefore acts as a bridge across a fragile transition. It cannot replace every retiring reactor, but keeping 1.2 gigawatts online gives grid planners more breathing room and reduces pressure to fill a shortfall with imported electricity or additional gas-fired generation.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Take a tour of Sizewell B nuclear power station\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/EH_YkVNgRaA?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><figcaption class=\"wp-element-caption\">YouTube: <em>@edfenergy<\/em>.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Nuclear alongside wind and solar<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Sizewell decision does not signal a retreat from renewable energy. On the same day, the government approved One Earth Solar Farm, a project that its developer says could supply more than 200,000 homes each year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That mix matters. Nuclear plants provide steady output in most weather, while <a href=\"https:\/\/okdiario.com\/techy\/en\/drax-is-buying-solar-and-wind-farms-in-a-560-million-deal-and-the-bigger-story-is-who-controls-renewable-capacity-after-the-boom\/5465\/\">wind and solar<\/a> can deliver large volumes of low-cost electricity when conditions are favorable. Batteries, flexible demand, stronger grids, and some backup generation are still needed to keep supply and demand matched hour by hour.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The strategy is not nuclear or renewables. It is nuclear with renewables, supported by the less visible equipment and market rules that keep the lights on when the weather or demand changes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1013\" src=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension.jpg\" alt=\"The Sizewell B nuclear power station facility in Suffolk, representing the UK&#039;s decision to extend its last operating nuclear plant lifespan by twenty years.\" class=\"wp-image-7147\" title=\"\" srcset=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension.jpg 1800w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension-300x169.jpg 300w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension-768x432.jpg 768w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension-1536x864.jpg 1536w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/08\/uk-sizewell-b-nuclear-plant-lifespan-extension-150x84.jpg 150w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" \/><figcaption class=\"wp-element-caption\">The UK government and EDF have agreed to extend the operating life of the Sizewell B nuclear power plant by 20 years, ensuring low-carbon electricity through 2055.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What consumers should watch<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The government estimates that Sizewell B would have saved consumers about $2.67 billion if the proposed contract had been operating during the energy price crisis that followed Russia\u2019s invasion of Ukraine. That is a backward-looking model, not a promise that household bills will fall by the same amount in the future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The real value will depend on wholesale power prices, inflation adjustments, plant availability, refurbishment costs, and whether the reactor continues to meet strict safety standards. EDF plans to replace piping, valves, and pumps, add automated plant monitoring, and install a new environmental monitoring system during regular outages.<\/p>\n\n\n\n<div class=\"gb-element-9e2492f3\">\n<div><div class=\"gb-looper-983df81f\">\n<div class=\"gb-loop-item gb-loop-item-8e4925a2 post-6611 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-21d5022e\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/a-us-startup-will-run-its-tiny-nuclear-reactor-for-150-hours-a-test-whose-outcome-could-change-remote-power\/6611\/\">A US startup will run its tiny nuclear reactor for 150 hours, a test whose outcome could change remote power<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">For households, the project is easy to overlook because nothing changes when a light switch is flipped. But preserving a large block of domestic, low-carbon electricity may prove valuable if <a href=\"https:\/\/okdiario.com\/techy\/en\/canada-just-lowered-a-953-ton-reactor-into-a-35-meter-shaft-and-it-could-power-300000-homes\/6638\/\">new reactors<\/a> arrive late or fossil fuel markets become volatile again.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A wider energy bet<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Britain\u2019s nuclear plan now stretches from Sizewell B\u2019s refurbishment to the construction of Sizewell C and the first <a href=\"https:\/\/okdiario.com\/techy\/en\/argentina-just-approved-a-1-2-billion-private-nuclear-reactor-though-the-american-company-behind-it-is-a-surprising-name\/6591\/\">small modular reactor fleet<\/a> at Wylfa. Together with Hinkley Point C, those new projects are expected to add almost 8 gigawatts of capacity during the 2030s.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sizewell B is the practical piece of that larger vision. It buys time, keeps experienced workers in the industry, and gives the country a firmer platform while newer technologies move from construction sites and factory plans onto the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is the bet now moving toward a final contract and regulatory review.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The press release was published by <a href=\"https:\/\/www.gov.uk\/government\/news\/sizewell-b-power-plant-given-lifetime-extension-to-2055\" target=\"_blank\" rel=\"noopener\"><em>GOV.U.K.<\/em><\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Britain has chosen to keep its newest operating nuclear plant running two decades longer, giving Sizewell B a path to &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Goodbye to early shutdown: the UK extended its last nuclear plant by 20 years while Spain stalls\" class=\"read-more button\" href=\"https:\/\/okdiario.com\/techy\/en\/goodbye-to-early-shutdown-the-uk-extended-its-last-nuclear-plant-by-20-years-while-spain-stalls\/7144\/#more-7144\" aria-label=\"Read more about Goodbye to early shutdown: the UK extended its last nuclear plant by 20 years while Spain stalls\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":7145,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-7144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tech","resize-featured-image"],"_links":{"self":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/7144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/comments?post=7144"}],"version-history":[{"count":1,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/7144\/revisions"}],"predecessor-version":[{"id":7148,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/7144\/revisions\/7148"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/media\/7145"}],"wp:attachment":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/media?parent=7144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/categories?post=7144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/tags?post=7144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}