{"id":5455,"date":"2026-06-21T18:45:00","date_gmt":"2026-06-21T23:45:00","guid":{"rendered":"https:\/\/okdiario.com\/techy\/en\/?p=5455"},"modified":"2026-06-21T09:20:14","modified_gmt":"2026-06-21T14:20:14","slug":"arklow-bank-wind-park-2-is-changing-its-offshore-design-and-the-redesign-shows-how-wind-farms-keep-moving-after-approval-battles","status":"publish","type":"post","link":"https:\/\/okdiario.com\/techy\/en\/arklow-bank-wind-park-2-is-changing-its-offshore-design-and-the-redesign-shows-how-wind-farms-keep-moving-after-approval-battles\/5455\/","title":{"rendered":"Arklow Bank Wind Park 2 is changing its offshore design, and the redesign shows how wind farms keep moving after approval battles"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">SSE Renewables has trimmed the proposed turbine count for Arklow Bank Wind Park 2, one of Ireland\u2019s most advanced offshore wind projects, reducing the plan from 56 turbines to 53 while keeping the project\u2019s headline capacity at 800 megawatts. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The revised filing is now before An Coimisi\u00fan Plean\u00e1la, Ireland\u2019s planning body, and it comes with updated environmental documents meant to answer concerns raised during the review process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At first glance, three fewer turbines may sound like a small tweak. But for coastal communities, seabirds, marine surveys, grid planners, and Ireland\u2019s clean energy ambitions, the redesign matters because it shows how <a href=\"https:\/\/okdiario.com\/techy\/en\/china-switched-on-a-26-mw-wind-turbine-that-can-power-40000-homes-and-offshore-wind-just-changed-scale-again\/5106\/\">offshore wind projects<\/a> are being forced to prove they can deliver power without brushing aside environmental questions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A smaller layout, same big target<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Arklow Bank 2 is planned for the Irish Sea, off the coasts of Wicklow and North Wexford. SSE says the updated submission includes a reduced turbine number and refinements to the offshore infrastructure layout, while the project remains a proposed 800-megawatt wind farm.<\/p>\n\n\n\n<div class=\"gb-element-a00da4e5\">\n<div><div class=\"gb-looper-46613eed\">\n<div class=\"gb-loop-item gb-loop-item-a8390598 post-5390 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-24a51617\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/hermeus-says-quarterhorse-can-switch-from-turbojet-to-ramjet-at-mach-3-5-and-that-is-why-concorde-suddenly-looks-slow\/5390\/\">Hermeus says Quarterhorse can switch from turbojet to ramjet at Mach 3.5, and that is why Concorde suddenly looks slow<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The project site sits on and around Arklow Bank, roughly 4 to 9 miles from shore. That is close enough for local residents to care deeply about the view, the construction work, and the long-term impact on the sea they know.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The update follows a Request for Further Information issued in April 2025. In plain English, planners wanted more detail, and SSE has now come back with updated reports, extra data, and a revised design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The environmental test<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is where clean energy stops being a slogan and becomes paperwork. SSE submitted an updated Environmental Impact Assessment Report and an updated <a href=\"https:\/\/www.arklowbank2offshoreplanning.ie\/nis\/\" target=\"_blank\" rel=\"noopener\">Natura Impact Statement<\/a>, drawing on more aerial, marine, and geotechnical surveys.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the company\u2019s filing, the updated research and modeling found that the proposed project\u2019s effects on coastal erosion and seabird populations would not be significant under the environmental assessment standard. That does not mean there is no impact at all, and it does not end the public debate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the most part, it means SSE believes it has enough evidence to show the project can move forward without causing the level of harm that would trigger a more serious environmental finding. Coastal residents may still ask a simpler question: what will this look and feel like in everyday life?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Public comment is still open<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The public still has a role to play. Observations can be submitted to An Coimisi\u00fan Plean\u00e1la during an eight-week window running from June 3, 2026, through July 29, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That window matters because offshore wind is not just about turbines out at sea. It affects ports, fishing interests, marine wildlife, local jobs, coastal identity, and the way electricity reaches homes and businesses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SSE says the updated documents can be viewed online through the <a href=\"https:\/\/www.arklowbank2offshoreplanning.ie\/\" target=\"_blank\" rel=\"noopener\">project\u2019s planning website<\/a>, along with supporting material for the application. An Coimisi\u00fan Plean\u00e1la\u2019s case page also lists the project as a marine development application with EIAR and NIS documents included.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1013\" src=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1.jpg\" alt=\"A digital rendering of the Arklow Bank Wind Park 2 layout off the coast of Ireland, showing the proposed offshore turbine distribution.\" class=\"wp-image-5457\" title=\"\" srcset=\"https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1.jpg 1800w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1-300x169.jpg 300w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1-768x432.jpg 768w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1-1536x864.jpg 1536w, https:\/\/okdiario.com\/techy\/en\/wp-content\/uploads\/2026\/06\/arklow-bank-wind-park-2-turbine-redesign-1-150x84.jpg 150w\" sizes=\"auto, (max-width: 1800px) 100vw, 1800px\" \/><figcaption class=\"wp-element-caption\">SSE Renewables has revised the layout for the Arklow Bank Wind Park 2, reducing the turbine count to 53 to address environmental concerns while maintaining an 800-megawatt capacity.<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Jobs, ports, and power<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Arklow Bank 2 is not starting from zero. SSE says the project has already secured planning consent for an operations and maintenance base at Arklow Harbour\u2019s South Dock, where around 80 full-time employees would be based.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate consent has also been secured for onshore cabling and a substation connection to Ireland\u2019s national electricity grid. Essentially, that means some of the land-side pieces of the project have already moved ahead, while the offshore consent remains the big missing piece.<\/p>\n\n\n\n<div class=\"gb-element-4272461b\">\n<div><div class=\"gb-looper-d6502904\">\n<div class=\"gb-loop-item gb-loop-item-5e8d29b8 post-5384 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-d450743c\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/a-solar-farm-was-built-to-make-electricity-but-the-ground-beneath-the-panels-quietly-began-doing-something-no-one-planned-for\/5384\/\">A solar farm was built to make electricity, but the ground beneath the panels quietly began doing something no one planned for<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">If the remaining consent is secured and the project is approved for delivery, construction could begin toward the end of the decade. SSE says power exports to Ireland\u2019s national grid could begin in the early 2030s.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The business case<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The numbers are large, even after the turbine cut. SSE estimates Arklow Bank 2 could support around 2,300 direct and indirect jobs across its delivery and operational lifetime.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company also estimates the project could deliver up to about $928 million in national economic benefit, with about $464 million (according to recent exchange rates) of that local to Wicklow and Wexford.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why the planning decision is not only an environmental story. It is also a business story, a jobs story, and a test of whether big renewable energy projects can keep investors, regulators, and local communities moving in the same direction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why it matters for Ireland<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ireland has set a target of 5 gigawatts of offshore wind by 2030. A single 800-megawatt project is equal to about 16% of that benchmark, although Arklow Bank 2\u2019s current timeline points to energy exports in the early 2030s rather than before the end of this decade.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That timing is the uncomfortable part. The country needs more clean, homegrown power, but the projects meant to supply it must pass environmental checks, secure grid connections, and win enough public trust to actually get built.<\/p>\n\n\n\n<div class=\"gb-element-b8f8eedf\">\n<div><div class=\"gb-looper-a1c20e91\">\n<div class=\"gb-loop-item gb-loop-item-c43822af post-5380 post type-post status-publish format-standard has-post-thumbnail hentry category-tech resize-featured-image\">\n<h4 class=\"gb-text gb-text-f0b4c389\">Also Read: <a href=\"https:\/\/okdiario.com\/techy\/en\/a-golden-fabric-lost-for-2000-years-has-returned-and-the-race-to-recreate-it-could-revive-one-of-industrys-oldest-materials\/5380\/\">A golden fabric lost for 2,000 years has returned, and the race to recreate it could revive one of industry\u2019s oldest materials<\/a><\/h4>\n<\/div>\n<\/div><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">James O\u2019Hara, head of offshore wind in Ireland at SSE Renewables, described the submission as \u201canother important step forward\u201d and said the design changes are intended to help the project be delivered \u201csensitively.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The road ahead<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For now, Arklow Bank 2 remains a proposal, not a finished wind farm. The reduced turbine count may help answer some concerns, but the final decision still depends on the planning process, the project\u2019s commercial route to market, and a final investment decision by SSE.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the end of the day, this is the balancing act facing offshore wind everywhere. Countries want cleaner electricity, companies want certainty, and communities want proof that the sea is not being treated like an empty construction zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arklow Bank 2 has now moved one step further through that test. The next question is whether fewer turbines, more data, and a revised layout will be enough to carry it across the line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The official statement was published on <a href=\"https:\/\/www.sserenewables.com\/news-and-views\/2026\/06\/public-invited-to-view-additional-information-for-arklow-bank-wind-park-2\/\" target=\"_blank\" rel=\"noopener\"><em>SSE Renewables<\/em><\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SSE Renewables has trimmed the proposed turbine count for Arklow Bank Wind Park 2, one of Ireland\u2019s most advanced offshore &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"Arklow Bank Wind Park 2 is changing its offshore design, and the redesign shows how wind farms keep moving after approval battles\" class=\"read-more button\" href=\"https:\/\/okdiario.com\/techy\/en\/arklow-bank-wind-park-2-is-changing-its-offshore-design-and-the-redesign-shows-how-wind-farms-keep-moving-after-approval-battles\/5455\/#more-5455\" aria-label=\"Read more about Arklow Bank Wind Park 2 is changing its offshore design, and the redesign shows how wind farms keep moving after approval battles\">Read more<\/a><\/p>\n","protected":false},"author":5,"featured_media":5456,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-5455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","resize-featured-image"],"_links":{"self":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/5455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/comments?post=5455"}],"version-history":[{"count":1,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/5455\/revisions"}],"predecessor-version":[{"id":5458,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/posts\/5455\/revisions\/5458"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/media\/5456"}],"wp:attachment":[{"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/media?parent=5455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/categories?post=5455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/okdiario.com\/techy\/en\/wp-json\/wp\/v2\/tags?post=5455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}